Net Metering with Batteries


Click to enlarge

Solar Net Metering On Grid 20KW System | PV 19440 Watt | Estimated 2000 to 2400 Units |

RRP:
Price:
PKR2,450,000
Vendor:
Brand:
Weight:
1.00 KGS
Rating:
()
Availability:
Shipping:
Calculated at checkout
Gift Wrapping:



Product Description

20KW Solar System 

Estimated Maximum 2000 to 2400Units Per/Month


  • Three phase, 20,000W 20KW, OnGrid Inverter (Chint, Growatt, Sungrow)
  • 19440 Watt Solar PV Tier -1 (A Grade) Tier 1 J.A/Canadian/jinko 540-550W Or Equilent
  • Solar Panel Structure ( NO Boundry Wall, No Shade )
  • AC & DC Wiring & Accessories, Miscellaneous Charges (Connectors, Junction Box, Combine Box, AC/DC Breakers, PV to Inverter Wires)
  • Civil Works
  • Transportation Chargers
  • Earthing If Required
  • Service Charges Installation
  • File Processing / PESCO Approval



 

Terms & Conditions:

1.    Prices are without taxes for Solar & Inverter (Imported).

2.    75% advance while rest of the payment will be addressed accordingly.

3.    Equipment will be available within a week or before after Payment order.

4.    Prices are valid for 2 days due to fluctuation in market effect on dollar price.

5.    System Services will be free for 1-Year which is based on technical condition.

6.    In case of change in structure and inverter; prices will increase or may differ, will be subject to site survey.

7.    Upon Site survey, such cost on project may decrease or increase, will be discussed during our meeting.

 

About  Net Metering:

1.    A copy of CNIC, latest paid PESCO Bill and property documents are required for Net Metering file process. All three documents must be with same name.

2.    Bi-directional Meter Installation and System Commissioning expected time will be 20~30 day (According to new SOPs by PESCO) or before the stipulated time, however in case of any new regulation or delay in PESCO process, such will be addressed (Informed) accordingly.

3.    It is mandatory by the client to process “Increase in sanction load”, “transfer of name” and “Change of name” by local Disco’s if required and from single phase to three phases (Rules of PESCO that owners will appear), only than we will be able to offer the Net Metering file process (Services).

 


Find Similar Products by Category